COG-480 Exam

IBM Cognos 8 Planning Professional

  • 科目编号:COG-480
  • 科目名称:IBM Cognos 8 Planning Professional
  • 考题数目:60 Q&As
  • 更新日期:2010-07-07
  • 价 格 : ¥ 462.00 ¥ 413.00

免费下载 COG-480 认证考题Demo

下载 COG-480 PDF 认证考试题库
下载 COG-480 测试版考试题库

 

选择 certinside COG-480 题库

COG-480 考试是 IBM 公司的 IBM Cognos 8 Planning Professional 认证考试官方代号,certinside 的 COG-480 权威考试题库软件是 IBM 认证厂商的授权产品,certinside 绝对保证第一次参加 COG-480 考试的考生即可顺利通过,否则承诺全额退款!

IBM Cognos 8 Planning Professional 认证作为全球IT领域专家 IBM 热门认证之一,是许多大中IT企业选择人才标准的必备条件。 如果你正在准备 COG-480 考试,为 IBM IBM Cognos 8 Planning Professional认证做最后冲刺,又苦于没有绝对权威的考试真题模拟, certinside 希望能助你成

1、certinside考题大师COG-480试题都是考试原题的完美组合,覆盖率95%以上,答案由多位专业资深讲师原版破解得出,正确率100%,只要您使用本站的考试题库参加COG-480 考试,我们保证您一次轻松通过考试;

2、售后服务第一!我们相信要想在当今时代取得成功,必须为广大用户提供全套的周到细致的全程优质售后服务,只有客户满意了,我们才能发展。客户至上是我们certinside考题大师的一贯宗旨;

3、certinside实行“一次不过全额退款”承诺。如果您购买我们COG-480的考题,只要不是首次通过,凭盖有PROMETRIC或VUE考试中心钢印的考试成绩单,我们将退还您购买COG-480考题大师的全部费用,绝对保证您的利益不受到任何的损失;

4、本站COG-480题库根据COG-480考试的变化动态更新,在厂家考题每次发生变化后,我们承诺2天内更新COG-480题库。在您购买我们的产品之后,我们将提供90天的免费更新。确保COG-480考题的覆盖率始终都在95%以上;我们提供2种 COG-480 考题大师版本供你选择。

5、软件版本COG-480 考试题库
优点:具有学习模式,测试模式,线上自动升级
缺点:仅限固定电脑使用,不可打印为文本,只能PC阅读

6、PDF 格式COG-480 考试题库(部分最新更新科目已不提供PDF)
优点:不需下载安装软件,方便用户打印和携带,但也带来了可随意制的弊端,因此我们提醒用户不得随意公开或出售本站的COG-480题库,一经发现立即取消其升级资格,且不予退款。
缺点:不具备测试模式,通过查看 certinside.cn网站及查收我们的更新E-MAIL获取更新信息。

certinside 的优势

COG-480 试题的质量和价值

certinside 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。

100% 保证您通过 COG-480 的考试

如果你使用 certinside 模拟测试,我们将保证你的第一次参加考试即取得成功,否则,我们将全额退款!

试用后再购买

certinside 提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性。

certinside认证考试题库网专业提供IBM COG-480 最新题库下载,完全覆盖 COG-480 考试原题。

 
 
Exam : IBM COG-480
Title : IBM Cognos 8 Planning Professional


1. When designing a model, which groups of people should be given greatest consideration?
A. Those entering or reviewing data.
B. Those administering the model.
C. Those developing and supporting the model.
D. Those importing the data from external sources.
Answer: A

2. When developing a Cognos Planning system, when is prototyping most useful?
A. When the user requirements are unclear.
B. When the development team is very large.
C. When the client can afford the extra time and cost required.
D. When the solution is being implemented for a department other than Finance.
Answer: A

3. Which of the following is a best practice when designing an Analyst model for ease of maintenance?
A. Use local allocations in D-Links when D-List items do not match.
B. Ensure the D-List items are all less than 30 characters in length.
C. Set up import links and use in the automation of the update of D-Lists.
D. Design many smaller D-Cubes instead of few large ones.
Answer: C

4. A company wants to use Contributor to plan several business processes. Salary planning is done every six months, revenue and expense planning is done on a rolling monthly basis, and capital expenditure is done annually.
To aid the planning process, which suggestion is considered best practice for this company?
A. One application to cover all of the business processes with D-Links to transfer data between D-Cubes.
B. An application for each business process with flat files to transfer data between them.
C. An application for each business process with system links and D-Links to transfer data between them.
D. An application for each business process with system links and administration links to transfer data between them.
Answer: D

5. How could the following D-Cube be improved so that it is easier for end users to understand what they need to input?
A. Remove the calculation D-List from the D-Cube.
B. Rename D-List items to use more familiar wording.
C. Rename the calculation D-List to reflect the calculations being performed.
D. Replace the Built in Function on the calculation D-List with simple calculations.
Answer: B

6. What issue is Iterative Development specifically designed to address?
A. No developed solution will satisfy all users equally.
B. Users often feel that IT does not understand the business.
C. The very act of developing a system or solution could change the business requirements.
D. Users understand their business processes but they do not usually understand application development.
Answer: C

7. What is a major flaw of the Waterfall approach to system development?
A. There is no Analyze phase; the steps go from Plan directly to Design.
B. Steps are followed sequentially without returning to previous steps.
C. Technical constraints tend to overrule user requirements.
D. This approach can only be implemented using large teams.
Answer: B

8. Which of the following is a best practice when designing to limit complexity in an Analyst model?
A. Design different D-Cubes for different purposes.
B. Use only simple calculations in the D-Lists.
C. Have one or two very large D-Cubes in the model.
D. Use D-Cubes with only short D-Lists.
Answer: A

客户反馈

有最新的题目下载吗?

COG-480 - 2009-10-20 10:01:30

你们这个网站的题目都是最新的吗?

COG-480 - 2009-10-19 13:55:24



产品保证 | 购买指南 | 常见问题 | 支付方式 | 退款协议 | 样品下载 | 考试引擎 | 隐私声明 | 联系我们 | 站点地图 1 2 3 4

Copyright©2006-2009 certinside Limited. All Rights Reserved