1Y0-614 Exam
Citrix Access Suite 4.0: Design
- 科目编号:1Y0-614
- 科目名称:Citrix Access Suite 4.0: Design
- 考题数目:123 Q&As
- 更新日期:2010-05-13
- 价 格 :
¥ 462.00¥ 413.00
免费下载 1Y0-614 认证考题Demo
下载 1Y0-614 PDF 认证考试题库
下载 1Y0-614 测试版考试题库
选择 certinside 1Y0-614 题库
1Y0-614 考试是 Citrix 公司的 Citrix Access Suite 4.0: Design 认证考试官方代号,certinside 的 1Y0-614 权威考试题库软件是 Citrix 认证厂商的授权产品,certinside 绝对保证第一次参加 1Y0-614 考试的考生即可顺利通过,否则承诺全额退款!
Citrix Access Suite 4.0: Design 认证作为全球IT领域专家 Citrix 热门认证之一,是许多大中IT企业选择人才标准的必备条件。 如果你正在准备 1Y0-614 考试,为 Citrix Citrix Access Suite 4.0: Design认证做最后冲刺,又苦于没有绝对权威的考试真题模拟, certinside 希望能助你成
1、certinside考题大师1Y0-614试题都是考试原题的完美组合,覆盖率95%以上,答案由多位专业资深讲师原版破解得出,正确率100%,只要您使用本站的考试题库参加1Y0-614 考试,我们保证您一次轻松通过考试;
2、售后服务第一!我们相信要想在当今时代取得成功,必须为广大用户提供全套的周到细致的全程优质售后服务,只有客户满意了,我们才能发展。客户至上是我们certinside考题大师的一贯宗旨;
3、certinside实行“一次不过全额退款”承诺。如果您购买我们1Y0-614的考题,只要不是首次通过,凭盖有PROMETRIC或VUE考试中心钢印的考试成绩单,我们将退还您购买1Y0-614考题大师的全部费用,绝对保证您的利益不受到任何的损失;
4、本站1Y0-614题库根据1Y0-614考试的变化动态更新,在厂家考题每次发生变化后,我们承诺2天内更新1Y0-614题库。在您购买我们的产品之后,我们将提供90天的免费更新。确保1Y0-614考题的覆盖率始终都在95%以上;我们提供2种 1Y0-614 考题大师版本供你选择。
5、软件版本1Y0-614 考试题库
优点:具有学习模式,测试模式,线上自动升级
缺点:仅限固定电脑使用,不可打印为文本,只能PC阅读
6、PDF 格式1Y0-614 考试题库(部分最新更新科目已不提供PDF)
优点:不需下载安装软件,方便用户打印和携带,但也带来了可随意制的弊端,因此我们提醒用户不得随意公开或出售本站的1Y0-614题库,一经发现立即取消其升级资格,且不予退款。
缺点:不具备测试模式,通过查看 certinside.cn网站及查收我们的更新E-MAIL获取更新信息。
certinside 的优势
1Y0-614 试题的质量和价值
certinside 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。
100% 保证您通过 1Y0-614 的考试
如果你使用 certinside 模拟测试,我们将保证你的第一次参加考试即取得成功,否则,我们将全额退款!
试用后再购买
certinside 提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性。
certinside认证考试题库网专业提供Citrix 1Y0-614 最新题库下载,完全覆盖 1Y0-614 考试原题。
Exam : Network General Corp
1Y0-614
Title : Citrix Access Suite 4.0:Design
1. If Harder Electronics decides to centralize the MfgData+ databases in New York, where should the Presentation Servers hosting the MfgData+ application be deployed?
A. Servers hosting MfgData+ should be deployed in New York.
B. Servers hosting the MfgData+ application should be deployed in New York, Mexico City, Shanghai and Bangalore.
C. The MfgData+ application should be deployed in Mexico City, Shanghai and Bangalore.
D. The Presentation Servers hosting MfgData+ should be deployed in all locations.
Answer: C
2. Harder Electronics plans to implement Presentation Server for users in Shanghai. How should the Shanghai site be designed?
A. Shanghai should be deployed as its own farm with its own License Server.
B. Shanghai should be aded to an existing producion farm and zone and should share licenses with the corporat License Server.
C. Shanghai should be deployed as its own zone with its own License Server.
D. Shanghai should be deployed as its own zone and should share licenses with the corporate License Server.
Answer: B
3. Based upon the given environment and requirements of Harder Electronics and the design decisions you're made so far, would you recommend a dedicated zone data collector?
A. No, instead apply the default load evaluator so that the server is subject to lower user load.
B. No, because Harder Electronics does not have the minimum recommended number of servers in its farms for dedicating a zone data collector.
C. Yes, combine the functions of the data collector and data store on a single server, as Harder Electronics is considering upgrading to SQL Server.
D. Yes, this will enable Harder Electronic the ability to expand the number of servers in the farm without impacting the overall performance of the Presentation Server environment.
Answer: B
4. Based upon the given environment and requirement of Harder Electronics and the design decisions your're made so far, would you recomment configuring zone preference and failover?
A. Yes, because they currently do not have a disaster recovery plan in place.
B. No, because they do not have site failover for back-end systems at this time.
C. Yes, because the data centers as well as backend data sources are geographically dispersed.
D. No, because zone preference and failover is only available when there are at least two zones in a given farm.
Answer: D
5. How should the data store be designed?
A. An MSDE data store database should be deployed in New York with daily incremental backups and weekly full backups.
B. The Access data store database should be retained since it already contains all farm information.
C. An Oracle data store database should be deployed in New York with updates occurring only once per day.
D. A SQL Server data store database should be deployed in New York with daily incremental backups and weekly full backups.
Answer: D
6. Harder Electronics has back-end databases that support HR+, TempoLicense, MfgData+, and Outlook. Based on the current locations of these databases, corporate office, and users, where should these database sources be moved?
A. The HR+ database should be centralized in New York, and all other databases should be kept in their current locations.
B. Both HR+ and the MfgData+ databases should be centralized in New York, and all other databases should be kept in their current locations.
C. All databases should be moved to New York.
D. All databases should be kept in their current locations.
Answer: A
7. Why should a static port be defined?
A. By defining a static port, system resources can be conserved.
B. A static port will allow for License Server communication to be more secure; thus, this is optimal.
C. There is no other way to establish communication over firewalls other than defining a static port.
D. To avoid the unpredictability of a dynamic port, a static port should be defined becuause it is more secure.
Answer: B
8. Based upon the given environment and requirements of Harder Electronics and the design decisions you're made so far, how would you design the zones?
A. Consolidate the eight data centers into one data center in New York based on a single zone.
B. Consolidate the three MEX zones into a single zone and the two PROD zones into a single, separate zone.
C. Consolidate the three MEX zones into a single zone and segregate the test/development zone within the PROD farm into a separate farm.
D. Segregate each data center into a zone, as the number of servers at each site is equivalent and adequate bandwidth exists across data centers.
Answer: C