000-357 Exam

IBM eServer i5 iSeries Multiple System Administration V5R3

  • 科目编号:000-357
  • 科目名称:IBM eServer i5 iSeries Multiple System Administration V5R3
  • 考题数目:100 Q&As
  • 更新日期:2010-05-06
  • 价 格 : ¥ 462.00 ¥ 413.00

免费下载 000-357 认证考题Demo

下载 000-357 PDF 认证考试题库
下载 000-357 测试版考试题库

 

选择 certinside 000-357 题库

000-357 考试是 IBM 公司的 IBM eServer i5 iSeries Multiple System Administration V5R3 认证考试官方代号,certinside 的 000-357 权威考试题库软件是 IBM 认证厂商的授权产品,certinside 绝对保证第一次参加 000-357 考试的考生即可顺利通过,否则承诺全额退款!

IBM eServer i5 iSeries Multiple System Administration V5R3 认证作为全球IT领域专家 IBM 热门认证之一,是许多大中IT企业选择人才标准的必备条件。 如果你正在准备 000-357 考试,为 IBM IBM eServer i5 iSeries Multiple System Administration V5R3认证做最后冲刺,又苦于没有绝对权威的考试真题模拟, certinside 希望能助你成

1、certinside考题大师000-357试题都是考试原题的完美组合,覆盖率95%以上,答案由多位专业资深讲师原版破解得出,正确率100%,只要您使用本站的考试题库参加000-357 考试,我们保证您一次轻松通过考试;

2、售后服务第一!我们相信要想在当今时代取得成功,必须为广大用户提供全套的周到细致的全程优质售后服务,只有客户满意了,我们才能发展。客户至上是我们certinside考题大师的一贯宗旨;

3、certinside实行“一次不过全额退款”承诺。如果您购买我们000-357的考题,只要不是首次通过,凭盖有PROMETRIC或VUE考试中心钢印的考试成绩单,我们将退还您购买000-357考题大师的全部费用,绝对保证您的利益不受到任何的损失;

4、本站000-357题库根据000-357考试的变化动态更新,在厂家考题每次发生变化后,我们承诺2天内更新000-357题库。在您购买我们的产品之后,我们将提供90天的免费更新。确保000-357考题的覆盖率始终都在95%以上;我们提供2种 000-357 考题大师版本供你选择。

5、软件版本000-357 考试题库
优点:具有学习模式,测试模式,线上自动升级
缺点:仅限固定电脑使用,不可打印为文本,只能PC阅读

6、PDF 格式000-357 考试题库(部分最新更新科目已不提供PDF)
优点:不需下载安装软件,方便用户打印和携带,但也带来了可随意制的弊端,因此我们提醒用户不得随意公开或出售本站的000-357题库,一经发现立即取消其升级资格,且不予退款。
缺点:不具备测试模式,通过查看 certinside.cn网站及查收我们的更新E-MAIL获取更新信息。

certinside 的优势

000-357 试题的质量和价值

certinside 模拟测试题具有最高的专业技术含量,只供具有相关专业知识的专家和学者学习和研究之用。

100% 保证您通过 000-357 的考试

如果你使用 certinside 模拟测试,我们将保证你的第一次参加考试即取得成功,否则,我们将全额退款!

试用后再购买

certinside 提供每种产品免费测试。在您决定购买之前,请检测联接,可能存在的问题及试题质量和适用性。

certinside认证考试题库网专业提供IBM 000-357 最新题库下载,完全覆盖 000-357 考试原题。

 
 
Exam : IBM 000-357
Title : IBM eServer i5 iSeries Multiple System Administration V5R3


1. A customer is using a High Availability business partner solution. They will need to journal the target system at switchover time but would like to avoid the overhead of target system journaling while operating it in target mode. Which of the following solutions will reduce the overhead and allow a quick changeover to full journaling at switchover?
A. Change the journal status to *STANDBY.
B. Change the journal status to *NOWRITE.
C. End Journal Object *ALL.
D. Change Journal Receiver status to *INACTIVE.
Answer: A

2. A data center with five eServer i5 systems and two HMC devices wants to have redundancy and remote access for the HMCs. How should the network be configured?
A. Place Port 1 from each of the Flexible Service Processors (FSPs) in a private network. Connect Port 1 from one HMC directly
into the FSP of the Service Provider system. Connect Port 1 of the other HMC directly into the second FSP in the private
network.
B. Place Port 1 on each Flexible Service Processor (FSP) and Port 1 from one HMC on a private network. Place Port 2 on each
FSP and Port 1 from the other HMC on another private network. Place Port 2 from each HMC onto the public network.
C. Place Port 2 from each HMC and Port 1 from each Flexible Service Processor (FSP) on a private network. Place Port 1 from
each HMC and Port 2 from each FSP on the public network.
D. Place Port 1 from each HMC and Port 1 from each Flexible Service Processor (FSP) on a private network. Place Port 2 from
each HMC and FSP onto the public network.
Answer: D

3. An administrator for an i550 with multiple LPARs wants to run different jobs after a production job finishes on the production LPAR. Job A should run if the production job ends normally, and job B should run if the production job ends abnormally. How can this be accomplished?
A. Use the HMC scheduler to set up a reactive schedule for the production LPAR on those batch jobs.
B. Use the Q_JOBEND_ABN exit program when the first job finishes.
C. Have jobs A and B access the first job's job log to see if it finished normally.
D. Install Advanced Job Scheduler (5722-JS1) and set job relationships.
Answer: D

4. Which of the following is an IBM supplied task role for an HMC user?
A. hmcsecofr
B. hmcsysopr
C. hmcuser
D. hmcsuperadmin
Answer: D

5. What is the recommended work management environment for interactive workloads?
A. All devices in a single subsystem
B. A subsystem for every 100 devices
C. A subsystem for every 300 devices
D. A subsystem for every 500 devices
Answer: C

6. The databases for an application need various levels of security. Some users need to be able to change the records (group 1), others need only read access (group 2), and the rest of the company should not be able to access the records at all. Which of the following is a valid method of securing the files?
A. Set *PUBLIC authority on all of the libraries to *EXCLUDE. Grant *USE authority to all of the database objects to group 2.
Grant *ALL authority to all the users in group 1.
B. Give the group 1 users *ALLOBJ authority. Set the *PUBLIC access to the files to *READ. Set the *PUBLIC access to the
library to *EXCLUDE.
C. List the specific users with change and read only access in an authorization list. Assign the authorization list to the objects and
set *PUBLIC to *EXCLUDE.
D. Set *PUBLIC access to the files to *CHANGE. Place group 2 in a group profile that has only *READ authority to the files. Set
*PUBLIC access to the library to *EXCLUDE.
Answer: C

7. An iSeries system has two i5/OS partitions. The Virtual LAN is configured to communicate between partitions for data replication. One of the partitions is connected outside the company firewall to host the company web server. What should the system administrator do in order to maximize security over the Virtual LAN between the partitions?
A. Add the QTMHHTTP and QSECOFR user profiles to the TCP/IP Port Restrictions table on each partition.
B. Enable only the *SIGNON and *FILE host servers on the partition inside the firewall.
C. Disable all TCP servers on the web partition that are not required for web serving and data replication.
D. Set up SSL on the Virtual LAN between the two partitions.
Answer: C

8. After doing some journal analysis, it has been determined that the receiver size needs to be changed. Which of the following is required to start using receivers with the new size?
A. End journaling of all objects, delete the journal, delete the receiver, create the receiver with the new size, create the journal,
and start journaling the objects.
B. Create a receiver with the new size and change the journal to use the new receiver.
C. Change the journal to generate a receiver using the new size.
D. Change the receiver to use the new size.
Answer: B




产品保证 | 购买指南 | 常见问题 | 支付方式 | 退款协议 | 样品下载 | 考试引擎 | 隐私声明 | 联系我们 | 站点地图 1 2 3 4

Copyright©2006-2009 certinside Limited. All Rights Reserved